T-bar 轻钢架(立体凹槽)
38mm高
概要
我们的T-bar 轻钢架由热浸镀锌钢材制成, 材料符合JIS G3302 SGCC 标准. 全面采用全自动机器生产, 除了可以满足高效率的生产速度外, 产品的尺寸更可以被精准掌控
System consists of
GI : 0.35mm / Main Runner : 38mm (height)
Item | Size in metric | Size in imperial | GI thickness | Dimension |
Main Runner | 3.6M (3600mm) | 12FT (3660mm) | 0.35mm | 15x38mm |
Cross Tee | 1.2M (1200mm) | 4FT (1220mm) | 0.35mm | 15x38mm |
Cross Tee | 0.6M (600mm) | 2FT (610mm) | 0.35mm | 15x38mm |
Wall Angle | 3.6M (3600mm) | 0.40mm | 15x20mm | |
Wall Angle | 3.0M (300mm) | 0.40mm | 15x20mm |
GI : 0.30mm / Main Runner : 38mm (height)
Item | Size in metric | Size in imperial | GI thickness | Dimension |
Main Runner | 3.6M (3600mm) | 12FT (3660mm) | 0.30mm | 15x38mm |
Cross Tee | 1.2M (1200mm) | 4FT (1220mm) | 0.30mm | 15x38mm |
Cross Tee | 0.6M (600mm) | 2FT (610mm) | 0.30mm | 15x38mm |
Wall Angle | 3.6M (3600mm) | 0.40mm | 15x20mm | |
Wall Angle | 3.0M (300mm) | 0.40mm | 15x20mm |
优势
- It is economical, easy to install, using less labor to complete the installation at minimum time as compared with conventional extruded aluminum tee system.
- Interchangeability of main and cross tees between systems, promotes lower inventory requirements and greater field flexibility.
- The straight entry locking feature of the section allows the system to be installed easily within close proximity of the overheads.
- The system promotes complete designs flexibility and it is capable of sustaining of loads normally designed into suspended tee system (refer to load table)
- Overlap type of cross tee provide complete flush joint, eliminating gaps between main runner and cross tees and ensure rigidity at fixtures.
- In line cross tees provide true double-lock action.


Before Fire
Effect after exposure to fire conditions.

After Fire

Installation Steps
- Step 1: Measuring and planning: Determine the lines for main runners and cross tees in such a way that tiles about the wall are at least half a tile (300mm)
- Step 2: Mark the desired ceiling height: Measure and mark the walls at all corners above the installation level. Snap a chalk line and test for level.
- Step 3: Inserting a nail between the wall and the wall angle at marked location serves as a good anchor for this purpose. Check to be sure the cross tee string is at 90°
- Step 4: Attach the main runners to the hangers
- Step 5: Install cross tees, assuring that they are adequately connected to main runners
- Step 6: Lay in panels, beginning at one corner and completing row by row.
Assembly
Each tee grids must be fitted always in the left position (Grey Color) of the slot. Hear the sound "Click"!
Disassembly
Need no tools!
Push, through the left thumb.
Then the tee's edge and simultaneously we pull the tee with our right palm.
Main Runners Disassembly
The disassembly must be done by a screwdriver with a slim tip.