我們的 T-bar 輕鋼架由熱浸鍍鋅鋼材製成, 材料符合 JIS G3302 SGCC 標準. 全面採用全自動機器生產, 除了可以滿足高效率的生產速度外, 產品的尺寸更可以被精準掌控

規格

  • 搭接, 白色

System consists of

G.I. : 0.30mm / height : 38mm

ItemSize in metricSize in imperialG.I. thicknessDimension
Main Runner3.6M (3600mm)12FT (3660mm)0.30mm15x38mm
Cross Tee1.2M (1200mm)4FT (1220mm)0.30mm15x38mm
Cross Tee0.6M (600mm)2FT (610mm)0.30mm15x38mm
Wall Angle3.6M (3600mm)0.40mm14x20mm
Wall Angle3.0M (3000mm)0.40mm14x20mm

G.I. : 0.27mm / height : 38mm

ItemSize in metricSize in imperialG.I. thicknessDimension
Main Runner3.6M (3600mm)12FT (3660mm)0.27mm15x38mm
Cross Tee1.2M (1200mm)4FT (1220mm)0.27mm15x38mm
Cross Tee0.6M (600mm)2FT (610mm)0.27mm15x38mm
Wall Angle3.6M (3600mm)0.40mm14x20mm
Wall Angle3.0M (3000mm)0.40mm14x20mm

優勢

  • It is economical, easy to install, using less labor to complete the installation at minimum time as compared with conventional extruded aluminum tee system.
  • Interchangeability of main and cross tees between systems, promotes lower inventory requirements and greater field flexibility.
  • The straight entry locking feature of the section allows the system to be installed easily within close proximity of the overheads.
  • The system promotes complete designs flexibility and it is capable of sustaining of loads normally designed into suspended tee system (refer to load table)
  • Overlap type of cross tee provide complete flush joint, eliminating gaps between main runner and cross tees and ensure rigidity at fixtures.
  • In line cross tees provide true double-lock action.
Ceiling suspension grid
Fire expansion joint within each length of main runner. Ceiling suspension grid
Before Fire
Effect after exposure to fire conditions. Ceiling suspension grid
After Fire
Ceiling suspension grid Assembly System

Installation Steps

  • Step 1: Measuring and planning: Determine the lines for main runners and cross tees in such a way that tiles about the wall are at least half a tile (300mm)
  • Step 2: Mark the desired ceiling height: Measure and mark the walls at all corners above the installation level. Snap a chalk line and test for level.
  • Step 3: Inserting a nail between the wall and the wall angle at marked location serves as a good anchor for this purpose. Check to be sure the cross tee string is at 90°
  • Step 4: Attach the main runners to the hangers
  • Step 5: Install cross tees, assuring that they are adequately connected to main runners
  • Step 6: Lay in panels, beginning at one corner and completing row by row.

Assembly
Each tee grids must be fitted always in the left position (Grey Color) of the slot. Hear the sound "Click"!

Disassembly
Need no tools!
Push, through the left thumb.
Then the tee's edge and simultaneously we pull the tee with our right palm.

Main Runners Disassembly
The disassembly must be done by a screwdriver with a slim tip.

檔案下載


暢銷產品

綠木 T-bar 輕鋼架 (15mm窄骨)服務簡介

綠木企業股份有限公司是台灣一家擁有超過26年經驗的專業T-bar 輕鋼架 (15mm窄骨)生產製造服務商. 我們成立於西元1987年, 在天花板與輕隔間的室內裝飾材料供應領域上, 綠木提供專業高品質的T-bar 輕鋼架 (15mm窄骨)製造服務, 綠木 總是可以達成客戶各種品質要求

熱門產品